Apollo IX Spacecraft

Apollo IX Spacecraft

  • $9.95
    Unit price per 


Have a school project due? Want extra credit? These models are perfect for that last minute project!

Download or Pre-Printed
All models can be purchased for immediate Download (pdf) starting at only $9.95 for the 7"x10", printed on any standard home or office printer,.  You will receive a download BUTTON on your confirmation page once you completed your order.

Our pre-printed shipped kits are printed on high quality color printers on thick card stock 60#+ paper for durability and mailed to you.

Shipping
We offer First-Class Parcel, 1-3 day shipping ($3) via United States Postal Service. Contact us if you want Tracking ($8) or Overnight Shipping ($28) at Sales@PaperModelsOnLine.com.

Your Best Way To Get An "A"!
 

The Buying Process

1. Pick your kit from more than 100 models.
2. Choose your model size; 7"x10" or 10"x13".
3. Choose Download or Pre-Printed Shipped.

That's it!

Samples

screen-shot-2016-09-20-at-2-20-30-pm sample-mission-san-diego-exploded-png sample-mission-san-diego-pieces-png
Sample Cover Exploded View Sample Pieces

Free History And Photos For Your Report

Apollo IX (9)

Apollo IX (9) was the third crewed mission in the United States Apollo space program, the second to be sent into orbit by a Saturn V rocket, and the first flight of the command and service module (CSM) with the Lunar Module (LM). Flown in Low Earth Orbit, its major purposes were to qualify the LM for lunar orbit operations and to show that the CSM could separate and move well apart, before rendezvousing and docking again, as they would have to do on the lunar landing missions to come.

The three-person crew consisted of Commander James McDivitt, Command Module Pilot David Scott, and Lunar Module Pilot Rusty Schweickart. During the ten-day mission, they tested systems and procedures critical to landing on the Moon, including the LM engines, backpack life support systems, navigation systems, and docking maneuvers.

After launching on March 3, 1969, the crew performed the first crewed flight of a LM, the first docking and extraction of a LM, one two-person spacewalk (EVA), and the second docking of two crewed spacecraft—two months after the Soviets performed a spacewalk crew transfer between Soyuz 4 and Soyuz 5. The mission concluded on March 13 and was a full success. It proved the LM worthy of crewed spaceflight, thus setting the stage for the dress rehearsal for the lunar landing, Apollo 10, before the ultimate goal, landing on the Moon.

Mission Background

McDivitt, Scott and Schweickart train for the AS-205/208 mission in the first block II Command Module, wearing early versions of the block II pressure suit. In April 1966, McDivitt, Scott, and Schweickart were selected by Deke Slayton as the second Apollo crew, as backup to Gus Grissom, Ed White, and Roger Chaffee for the first crewed Earth orbital test flight of the block I command and service module, designated AS-204 expected to fly in late 1966.

This was to be followed by a second block I flight, AS-205, to be crewed by Wally Schirra, Donn Eisele, and Walter Cunningham. The third crewed mission, designated AS-207/208, was planned to fly the block II command module and the lunar module in Earth orbit, launched on separate Saturn IBs, with a crew to be named.

However, delays in the block I CSM development pushed AS-204 into 1967. By December 1966, the original AS-205 mission was cancelled, Schirra's crew was named as Grissom's backup, and McDivitt's crew was promoted to prime crew for the LM test mission, redesignated AS-205/208. On January 26, 1967, they were training for this flight, expected to occur in late 1967, in the first block II Command Module 101 at the North American plant in Downey, California.

The next day, Grissom's crew were conducting a launch-pad test for their planned February 21 mission, which they named Apollo 1, when a fire broke out in the cabin, killing all three men and putting an 18-month hold on the crewed program while the block II command module (CM) and A7L pressure suit were redesigned for safety.

As it turned out, a 1967 launch of AS-205/208 would have been impossible even without the Apollo 1 accident, as problems with the LM delayed its first un-crewed test flight until January 1968. NASA was able to use the 18-month hiatus to catch up with development and un-crewed testing of the LM and the Saturn V launch vehicle.

By October 1967, planning for crewed flights resumed, with Apollo 7 being the first Earth orbit CSM flight (now known as the C mission) in October 1968 given to Schirra's crew, and McDivitt's mission (now known as the D Mission) following as Apollo 8 in December 1968, using a single Saturn V instead of the two Saturn IBs.

This would be followed by a higher Earth orbit flight (E Mission), to be crewed by Frank Borman, Michael Collins, and William Anders in early 1969.  However, LM problems again prevented it from being ready for the D mission by December, so NASA officials created another mission for Apollo 8 using the Saturn V to launch only the CSM on the first crewed flight to orbit the Moon, and the E mission was cancelled as unnecessary.

Slayton asked McDivitt and Borman which mission they preferred to fly; McDivitt wanted to fly the LM, while Borman volunteered for the pioneering lunar flight. Therefore, Slayton swapped the crews, and McDivitt's crew flew Apollo 9.  The crew swap also affected who would be the first crew to land on the Moon; when the crews for Apollo 8 and 9 were swapped, their backup crews were also swapped. Since the rule of thumb was for backup crews to fly as prime crew three missions later, this put Neil Armstrong's crew (Borman's backup) in position for the first landing mission Apollo 11 instead of Pete Conrad's crew, who made the second landing on Apollo 12.

Copyright © Paper Models, Inc.


We Also Recommend